Product Description
Biodegradable rice straw tableware makingg machine edible dink straw double screw production line
The rice straw is produced by using the puffing extrusion process.It can be soaked in hot drinks for 2 to 3 hours.It could last 5 to 10 hours or longer when it is in cold drinks. You can also adjust the raw materials to make straws with different colors. The appearance of the rice straws is the same as that of ordinary plastic straws. The surface of the rice straws is smooth, strong and tough. Compared with ordinary plastic straws, the rice straws can be eaten directly. The taste is crunchy. The raw material of rice straw include broken rice, cassava flour and so on. In addition, you also could add different raw materials to make colorful rice straw.
Product Parameters
Model |
EXT100 |
TSE75 |
Installed power |
100kw |
200kw |
Production capacity |
100-150kg/h |
200-300kg/h |
Appearance size |
50000*2000*2200mm |
60000*2000*2600mm |
Sample Photos
Detailed Photos
Mixer:Mix the materials with water or other liquid.
Twin extruder:The double-screw extruder consists of feeding system, extruding system, cutting system, heating system, transmission system and controlling system.
We will feed the material from the feeding machine and get the tissue state by inflating the material and the machine barrel must be high temperature, high pressure and high cutting. The material can be sterilized by the high temperature and high pressure and make the product safe.
Screw convenyor:Convey the materials into twin screw extruder.
Cooling convenyor:Cool the soy product down before packing
Packaging & Shipping
1)Packed the machine with winding film or carton.
2)Fixed the machine on bracket with wire.
3)packed with wooden case.
Company Profile
Certifications
FAQ
Q1: Are you a trade company or a manufacturer?
A1:We are a manufacturer,we have own factory and R&D department.
SGS has certified our company on site.welcome to visit our factory and check the machines.
Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss
before contract.
Q3: Could you supply all the parameters about the machines?
A3: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q4. Can you provide food or feed formula?
A4: We can provide basic formula for produce the food etc.
And help customer to produce new products according to customer's formula.
Q5: What is your terms of payment ?
A5: 30% T/T in advance ,70% balance before shippment after inspection.
Q6: How about the after-service?
A6: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.