After-sales Service: | One Year |
---|---|
Warranty: | One Year |
Application: | Rice Straw Production Line |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
The rice straw is produced by using the puffing extrusion process.It can be soaked in hot drinks for 2 to 3 hours.It could last 5 to 10 hours or longer when it is in cold drinks. You can also adjust the raw materials to make straws with different colors. The appearance of the rice straws is the same as that of ordinary plastic straws. The surface of the rice straws is smooth, strong and tough. Compared with ordinary plastic straws, the rice straws can be eaten directly. The taste is crunchy. The raw material of rice straw include broken rice, cassava flour and so on. In addition, you also could add different raw materials to make colorful rice straw.
Model | EXT100 | TSE75 |
Installed power | 100kw | 200kw |
Production capacity | 100-150kg/h | 200-300kg/h |
Appearance size | 50000*2000*2200mm | 60000*2000*2600mm |
Before sales:
1).Provide the free consultation of the equipment.
2).Provide the standard device and the flow chart.
3). According to the clients' special requirement, offering the reasonable plan and free design helping to select the equipment..
During sales:
1).Help client design the factory and offering professional advice, free engineering drawing for the factory layout.
2).Welcome to visit our factory or the domestic clients' factory.
3).Inspect the machine before leaving the factory.
After sales:
1).Oversea install and debug the equipment.
2).Train the first-line operator.
3).Provide the basic formula.
Q1: Are you a trade company or a manufacturer?
A1:We are a manufacturer,we have own factory and R&D department.
SGS has certified our company on site.welcome to visit our factory and check the machines.
Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q3: Could you supply all the parameters about the machines?
A3: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q4. Can you provide food or feed formula?
A4: We can provide basic formula for produce the food etc.
And help customer to produce new products according to customer's formula.
Q5: What is your terms of payment ?
A5: 30% T/T in advance ,70% balance before shippment after inspection.
Q6: How about the after-service?
A6: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Suppliers with verified business licenses