Automatic high capacity Fried food production line, fried leisure puffed food equipment
Jinan Xilang snack extruded food production line adopts advanced twin-screw screw efficient extrusion technology to mix all kinds of different grain raw materials evenly by mixing machine in the extruder by high temperature and high pressure, in the abrasive extrusion instant pressure loss, the formation of porous, soft extruded food, change the mold can produce a variety of shapes of products
Process flow:
1.Mixer→ 2.Screw Conveyor→ 3.Twin Screw Extruder→ 4. Shaping Cutter→ 5.Hoister→ 6.Continuous Fryer
→ 7.Vibrating Deoiling machine→ 8.Hoister→ 9. Single Roller
Model |
XL65 twin screw extrude line |
XL70 twin screw extrude line |
XL85 twin screw extrude line |
Installed power |
72kw |
95kw |
150kw |
Actual consumption power |
50kw |
70kw |
110kw |
Production capacity |
100-150kg/h |
200-300kg/h |
350-500kg/h |
Appearance size |
16000x1600x2300mm |
17600x1600x2300mm |
20000x1600x3500mm |
Jinan Xilang Machine Co.,ltd is a professional Manufacturer specializing in researching and producing Extrusion machinery,Industrial microwave drying and sterilizing equipment and related ancillary equipment.The Company is located in Jinan,the spring city of Shandong. With the strong design strength,advanced producing technology and rich manufacturing experience,the company`s products get good comments from domestic and abroad customers.
Our main products include machinery and equipment for pasta system, corn flakes system, breakfast cereal system, baby food system, corn puff snacks system, fried pellets system, fortified nutrition rice system,soy nuggets system, pet food system , fish feed system , various type drying oven system, corn meal milling system etc.
Our machines have been exported to many countries of Asia, America, Africa, Europe etc. So Don't hesitate to contact us. Xilang team from pre -service to after-service will show your choice is worth it.
Q1: Are you a trade company or a manufacturer?
A1: we are a manufacturer, welcome to visit our factory and check the machines.
Q2: How long is your delivery time?
A2: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q3: Could you supply all the parameters about the machines?
A3: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q4: What is your terms of payment ?
A4: 30% T/T in advance ,70% balance before shippment after inspection.
Q5: How about the after-service?
A5: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.