After-sales Service: | 24 Hours Online |
---|---|
Warranty: | 12 Months |
Type: | Pressing Machines |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Corn Flakes Breakfast Cereals Processing Production Line Crispy Maize Making Machine
XILANG MACHINERY Breakfast cereals use cereals as main raw material.After extruding(or boiling), planishing,drying,roasting, coating and cooling, or after extruding and inflating to produce such as ring,grain or flakes shape. These kinds of food can be mixed with coffee or milk. Of course, it can be eaten directly as snacks with good taste.
Flow chart: Flow Chart: 1.Mixer→ 2.Screw Conveyor→ 3.Twin Screw Extruder→ 4.Vibrate Cooler→ 5.Hoister→ 6.Rollers drying machine→ 7.Air conveyer→ 8. Flaking machine→9.Air conveyer→10.Multi-layer drying machine→11.Hoister→12.Vibrate Cooler→13.High temperature inflated oven→14.Sugar sprayer→15.16.Multi-layer drying machine with hoister→17.Cooling machine
Model | XL-65 | XL-70 | XL-75 | XL-78 |
Main motor | 22kw | 37kw | 55kw | 90kw |
Production capacity | 80-120kg/h | 150-250kg/h | 300-450kg/h | 500-1000kg/h |
Factory showing
Machine manucature
Customer Case
Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check the machines.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q: Could you supply all the parameters about the machines?
A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shipment after inspection.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Q:Do you supply any formula to buyer?
A: yes, we supply formulas to buyer.
Q: What's the warranty?
A: warranty one year.
Suppliers with verified business licenses